
SAE8620 1.6523 Special Mould Steel Bar For Structure Tool Steel
Guangzhou Changfeng Steel Co., Ltd.- Type:Alloy Steel Bar
- Standard:AISI, ASTM, DIN, JIS, GB, BS
- Composition:Alloy Steel
- Technique:Hot Rolled
- Shape:Round Bar
- Surface Treatment:Black, Grinded, Machined
Base Info
- Model NO.:1.6523, SAE8620, 20CrNiMo
- Special Use:Wear Resistant Steel, Free Cutting Steel, Mold Steel
- Application:Tool Steel Bar
- Heat Treatment:Annealing,Q+T
- Test:SGS,Ut 100%,Element Testing
- Certificate:ISO ,Mill Certificate
- Payment:30%Deposit, Blance by L,C at Sight or T,T
- Delivery Quatity:Include MOQ
- Delivery status:Annealing or Prehardening
- Transport Package:Export Standard Packing or Customers′demand
- Specification:diameter 20-200mm
- Trademark:CF STEEL
- Origin:China
- HS Code:7228300000
- Production Capacity:1000t,Month
Description
temperHeating temperature/ºC Cooling way Hardness (HRC) Tempering temperature
/ºC Tempering number Hardness
(HRC) 850 Oil Cooling or Air Cooling 60-63 200 1 ≥59
5. Melting Process
1) EAF:Electric Furnace+LF+VD (Optional);
2) ESR:Electric Furnace+LF+VD+Eleroslag Remelted (Optional);
6. Packaging Details:
Packed with plastic film, seaworthing packing, others according to customers' requirements;
7. Delivery time:
For abundant stock, 15-20 days.For customized products, 30-50 days.
8. Delivery status
Delivered by heat treatment (normalizing, annealing or high temperature tempering) or non thermal treatment. The delivery status shall be marked in the contract.
Why Choose Us
1) Competitive price andquality from our own factory
2) Approved by ISO9001,CE,SGS every year
3) Best service with 24 hours reply
4) Flexible payment with T/T,L/C
5) Trade AssuranceSmooth production ability(1000tons/month)
6) Quick delivery and standard exporting package
7) OEM/ODM
Corner of factory:





/ºC
(HRC)
5. Melting Process
1) EAF:Electric Furnace+LF+VD (Optional);
2) ESR:Electric Furnace+LF+VD+Eleroslag Remelted (Optional);
6. Packaging Details:
Packed with plastic film, seaworthing packing, others according to customers' requirements;
7. Delivery time:
For abundant stock, 15-20 days.For customized products, 30-50 days.
8. Delivery status
Delivered by heat treatment (normalizing, annealing or high temperature tempering) or non thermal treatment. The delivery status shall be marked in the contract.
Why Choose Us
1) Competitive price andquality from our own factory
2) Approved by ISO9001,CE,SGS every year
3) Best service with 24 hours reply
4) Flexible payment with T/T,L/C
5) Trade AssuranceSmooth production ability(1000tons/month)
6) Quick delivery and standard exporting package
7) OEM/ODM
Corner of factory:




