
Manufacturer Price 201 304 316 Cold Rolled No. 4 Stainless Steel Plate
Shaanxi Chengxin Yongsheng Metal Co., Ltd.- Certification:ISO, RoHS, IBR, AISI, ASTM, GB, EN, DIN, JIS
- Grade:300 Series
- Standard:ASTM, AISI, GB, JIS, DIN, EN
- Type:Stainless Steel Sheets
- Shape:Flat
- Technique:Cold Rolled or Hot Rolled
Base Info
- Transport Package:Sea Worthy Packing
- Price Term:EXW, Fob, CIF
- Surface:No.1,2b,No.4,Hl,Ba,8K
- Lead Time:7 Days After Get Advance Payment
- MOQ:1 Ton
- Process:Cold Rolled or Hot Rolled
- C.O.:Provide
- Width:10-2000mm or as Required
- Length:1-10m or as Required
- Thickness:0.3-115mm or as Required
- Material:300 Series
- Model:Stainless Steel Plate
- Surface Treatment:Ba , 2b , 2D , Hl , 8K,Satin Polish , Mirror
- Model NO.:201,304,316,316L
- Specification:As Requirement
- Trademark:Chengxi Yongsheng Metal
- Origin:Made in China(Mainland)
- HS Code:7219310000
- Production Capacity:5000 Ton,Tons Per Month
Description
stain brush or as required
1. Surface polish
2. Bundle package
3. Wooden case, wooden pallet package
4. Container or bulk
5. Special according to customer's request
1. Construction field, the shipping building industry
2. Petroleum and Chemical Industries
3. Food and Mechanical Industries
4. Boiler Heat Exchange
5. Machinery and Hardware Industries
Our Advantages
FAQ
Q1: What products can you offer?
A: We can offer you general steel types like 310S, 316L,304.304L.201,904L, 316H, 316,316L 300and
400 series, and duplex stainless steel like 2205, 2304,2101,2507,etc. 904L, 800H, 600H high-nickel alloy.
Q2. Can you produce the products according to my own drawings?
Yes, we can produce the products according to your drawings that will be most satisfy you.
Q3. What does your factory do regarding quality control?
Quality is a priority. We always attach great importance to quality control from beginning to end.
Q4. Can I request to change the form of packaging and transportation?
Yes, We can change the form of the packaging and transportation according to your request,
but you have to bear their own costs incurred during this period and the spreads.
Q5. What does your factory do regarding quality control?
Quality is a priority. We always attach great importance to quality control from beginning to end.
Q6. How long is the delivery time?
A: 7~20 working days after confirming the payment.
If the order is urgent, we will push our workshop finish in advance.
Q7. What is your Payment?
A: 100% T/T advance, Western Union (For Small Order)
B: 30% T/T and balance 70% before the shipment
C: 100% Irrevocable LC at sight (For Big Order)