Steel & Products

Ms Black Pipe Tube Scaffolding Tube Light Pole Tube 6m 7m 8m A106b

TIANJIN FRIEND STEEL TUBE CO., LTD.
  • Type:Welded
  • Technique:ERW
  • Material:Carbon Steel
  • Surface Treatment:Galvanized
  • Usage:Pipeline Transport, Boiler Pipe, Oil,Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
  • Section Shape:Round

Base Info

  • Model NO.:1,2" - 10"
  • Standard:ASTM, GB, JIS, DIN, API, BS, ASTM A106-2006, ASTM
  • Grade:Q195-Q345, A53-A369, St35-St52, 10#-45#, Q235, Q34
  • Thickness:1mm - 10mm
  • Outer Diameter:21.3 mm - 273 mm
  • Tolerance:+,-5%
  • Processing Service:Bending, Welding, Punching, Cutting
  • Secondary or Not:Non-Secondary
  • Pipe Ends:Plain, Bevel, Threaded or Grooved
  • Alloy or Not:Non-Alloy
  • Product Name:Pipe, Tube
  • Length:as Customers′ Requirement
  • Zinc Coating:220 G,M2 ( or Customized)
  • End Protector:None or Plastic Caps
  • Place of Origin:Tianjin, China
  • Transport Package:Packing by Steel Strips
  • Specification:21.3-273MM , 1,2"-10" , DN 15-250
  • Trademark:TFCO
  • Origin:Tianjin, China
  • HS Code:73063090
  • Production Capacity:70000 Ton , Year

Description

OverviewQuick DetailsStandardASTM, GB, JIS, DIN, API, BS, ASTM A106-2006, ASTM A53-2007, ASTM A 53M-2007, ASME B36.10M-2004, GB /T 3091-2001, GB/T 13793-1992, JIS J3444-2006, JIS J3466, DIN 2444, API 5L, BS 1387, BS 1139, BS 4568, BS EN 39GradeQ195-Q345, A53-A369, ST35-ST52, 10#-45#, Q235, Q345, Q195, Q215,A53(A,B), A106(B,C), ST 42, 10#, 20#Thickness1MM - 10MMSection ShapeRoundOuter Diameter21.3 MM - 273 MMPlace of OriginTianjin, ChinaApplicationStructure PipeTechniqueERWCertificationISO9001 ISO18001 ULSurface TreatmentGalvanized or Painted or BlackSpecial PipeThick Wall PipeAlloy Or NotNon-AlloyTolerance±5%TypeWeld Steel PipeProcessing ServiceBending, Welding, Punching, CuttingProduct NamePipe, TubeSecondary or NotNon-secondaryLengthAs Customers' RequirementMaterialCarbon Steel (Q195, Q235, Q345)Zinc Coating220 g/m2 ( or Customized)Pipe EndsPlain, Bevel, Threaded or GroovedEnd ProtectorNone or Plastic Caps Packing & DeliveryPackingPacking by steel stripsMs Black Pipe Tube Scaffolding Tube Light Pole Tube 6m 7m 8m A106bMs Black Pipe Tube Scaffolding Tube Light Pole Tube 6m 7m 8m A106b DeliveryAccording to Order Quantity Supply AbilitySupply Ability70000 Ton Per Year Regular Size ( Steel Pipe Profile )Size (Outer Diameter)Wall ThicknessLength21MM ( 1/2")1.4MM --2.75MM6M  (or Customized)26MM (3/4")1.4MM --2.75MM6M  (or Customized)33.4MM (1")1.4MM -- 3.5 MM6M  (or Customized)42.2MM(1 1/4")1.4MM -- 3.5 MM6M  (or Customized)48.3MM (1 1/2")1.5MM -- 4.0 MM6M  (or Customized)60.3MM (2")1.5MM -- 4.0 MM6M  (or Customized)73MM (2 1/2") - ASTM STANDARD1.8MM -- 5.5 MM6M  (or Customized)76MM (2 1/2") -- BS STANDARD1.8MM -- 5.5 MM6M  (or Customized)88.9MM (3")2.0MM -- 5.5 MM6M  (or Customized)114.3MM (4")2.0MM -- 6.5 MM6M  (or Customized)141.3MM (5")2.5MM -- 6.5 MM6M  (or Customized)165MM(6") - BS STANDARD2.5MM -- 7.5 MM6M  (or Customized)168.3 MM (6") - ASTM STANDARD2.5MM -- 7.5 MM6M  (or Customized)219.1MM (8")2.5MM -- 9.0 MM6M  (or Customized)Pipe Quality Control
Ms Black Pipe Tube Scaffolding Tube Light Pole Tube 6m 7m 8m A106bSteel Pipe Packing & ShippingMs Black Pipe Tube Scaffolding Tube Light Pole Tube 6m 7m 8m A106bMs Black Pipe Tube Scaffolding Tube Light Pole Tube 6m 7m 8m A106b Company ProfileOur Honor
Ms Black Pipe Tube Scaffolding Tube Light Pole Tube 6m 7m 8m A106bOur Team
Ms Black Pipe Tube Scaffolding Tube Light Pole Tube 6m 7m 8m A106b

FAQ
 1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container,mixed acceptable .


2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted).


3. Q: What's your delivery time?
A: 10-20 days after received the advance payment .


4. Q: Are you manufacturer or trader?
A: We are a professional steel product manufacturer with more than 15 years of export experience.

5. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing), close to Tianjin Port

6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

7. Q: Can you supply other steel products?
A: Yes.