Steel & Products

Structural Reinforcing Hot Rolled Building Material Deformed Rods Steel Rebar for Construction Iron

Shandong Ruixin Metal Products Co., Ltd.
  • Length:6m 8m 10m 12m and Customized
  • Warranty:5 Years
  • After-sales Service:7X24 Hour Online Technical Services
  • Standard:ASTM,JIS,GB,AISI
  • Diameter:6mm-40mm
  • Tolerance:+,-0.2%

Base Info

  • Trademark:ruixin
  • Specification:6mm 8mm 10mm and Customized
  • Transport Package:Bundle
  • MOQ:1ton
  • Delivery Time:7 Days
  • Model NO.:HRB335 HRB400 HRB500
  • Origin:China
  • HS Code:7208512000
  • Production Capacity:900000 Tons

Description

Structural Reinforcing Hot Rolled Building Material Deformed Rods Steel Rebar for Construction IronStructural Reinforcing Hot Rolled Building Material Deformed Rods Steel Rebar for Construction IronStructural Reinforcing Hot Rolled Building Material Deformed Rods Steel Rebar for Construction IronPacking method: Steel strip packaging or customizationDelivery cycle:Complete the delivery within 5-10 days after your payment.About us:
Structural Reinforcing Hot Rolled Building Material Deformed Rods Steel Rebar for Construction IronCertificate:
Structural Reinforcing Hot Rolled Building Material Deformed Rods Steel Rebar for Construction Iron
We have cooperated with experienced shipping forwarders for many years, they arrange the shipment. No matter by express, by airor by sea, we will track the course of the goods all the way, to make sure goods arrive at you on time and in good condition.
Transportation and payment:
Structural Reinforcing Hot Rolled Building Material Deformed Rods Steel Rebar for Construction Iron
We support sea transportation, air transportation, land transportation, international express and other transportation conditions.
Structural Reinforcing Hot Rolled Building Material Deformed Rods Steel Rebar for Construction Iron
We support LC, TT, Western Union and other payment methods.
FAQ:
Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;
for products need new production for common materials,usually make shipments in 7-10 days;
for products need special and rare materials,usually need 15-20 days to make shipment.

 Q2. Can you provide the samples?
A:Samples can be provided with samples' charge and courier fee by the buyer's side.

Q3: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow
up your case.


Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive.
Airline and sea shipping also optional.
For mass products, ship freight is prefered.

 Q5. Can you accept customize?
A: Yes. It can be customized as per the customers' request.