Steel & Products

China Suppliers. 304 201 Grade Foshan Factory Stainless Steel Coil

Shandong Hongze International Trade Co., Ltd.
  • Certification:AISI, ASTM
  • Grade:2B
  • Standard:ASTM
  • Type:Stainless Steel Coils
  • Shape:Round
  • Technique:Hot Rolled

Base Info

  • Trademark:HONGZE
  • Specification:0.3mm-50mm
  • Transport Package:Standard Sea Package
  • Sample:Avaliable
  • Hardness:Soft 1,4h 1,2h 3,4h
  • Delivery Time:7-15 Days
  • Surface:Ba,2b,No.1,No.3,No.4,8K,Hl,2D,1d
  • Surface Treatment:Polished
  • Model NO.:HZ2022
  • Origin:China
  • HS Code:7219340000
  • Production Capacity:5000 Tons Per Month

Description

Overview Product DescriptionOur Advantages

Detailed Photos

China Suppliers. 304 201 Grade Foshan Factory Stainless Steel Coil
China Suppliers. 304 201 Grade Foshan Factory Stainless Steel Coil
China Suppliers. 304 201 Grade Foshan Factory Stainless Steel Coil

Certifications

China Suppliers. 304 201 Grade Foshan Factory Stainless Steel Coil

Packaging & Shipping

China Suppliers. 304 201 Grade Foshan Factory Stainless Steel CoilChina Suppliers. 304 201 Grade Foshan Factory Stainless Steel Coil

FAQ

Q1: What products can you offer?

A: We can offer you general steel types like 310S, 316L,304.304L.201,904L, 316H, 316,316L 300and 
400 series, and duplex stainless steel like 2205, 2304,2101,2507,etc. 904L, 800H, 600H high-nickel alloy.

Q2. Can you produce the products according to my own drawings?

Yes, we can produce the products according to your drawings that will be most satisfy you.

Q3. How does your factory do regarding quality control?

Quality is a priority. We always attach great importance to quality controlling from the beginning to end.

Q4. Can I request to change the form of packaging and transportation?

Yes, We can change the form of the packaging and transportation according to your request, 
but you have to bear their own costs incurred during this period and the spreads.
 

Q5. How does your factory do regarding quality control?

Quality is a priority. We always attach great importance to quality controlling from the beginning to end.


Q6. How long is the delivery time?

A: 7~20 working days after confirming the payment.
If the order is urgent, we will push our workshop finish in advance.

Q7. What is your Payment? 

A:  100% T/T advance, Western Union (For Small Order) 

B:  30% T/T and balance 70% before the shipment