
Cold Rolled AISI SUS 201 304 316L 310S 409L 420 Stainless Steel Coil with High Quality Factory Price
Wuxi Juzerun Steel Co., Ltd.- Technique:Cold Rolled
- Surface Treatment:Milling
- Certification:ISO, RoHS, IBR
- Standard:ASTM, AISI, GB, JIS, DIN, BS
- Type:Steel Coil
- Application:Ship Plate, Boiler Plate
Base Info
- Process:Cold , Hot Rolled
- Delivery:Within 15 Days After Receiving The Deposit
- Package:Standard Sea Packaging or as Required
- Thickness:0.3~180mm Thickness
- Shape:Sheet, Coils,Strips
- Surface:2b,Ba,No.4,Mill Edge,Slit Edge
- Model No.:304L
- Stock:Stock
- Special Use:Measuring Tools, Cutters in Common Steel
- Model NO.:200 300 400 Series
- Transport Package:Standard Sea Packaging
- Specification:Customized
- Trademark:OEM
- Origin:China
- HS Code:72209000
- Production Capacity:500 Ton, Month
Description
Overview


For stock products, will make shipments in 5- 7 days after receiving deposit or receiving L/C; for products
need new production for common materials, usually make shipments in 15-20 days; for products need new production for special and rare materials, usually need 30-40 days to make shipment.
2. Will the Test Certificate be certified to EN10204 3.1?
For the new production products no need furthur cutting or processing, will provide the Original Mill Test Certificate certified to EN10204 3.1; for the stock products and the products need cutting or furthur processing, will issue Certificate of Quality on our Company, It will show the original mill name and the riginal datas.
3. Once the received products found not comply with the products the contract demands, what will you do?
Once the received products found not comply with the products the contract lists, when receiving the picturesand the official documents and data from your side, if it is proved not comply, we will compensate the loss at first time.
Product Description
Detailed Photos


Applications
Packaging & Shipping
Related Products Company Profile
FAQ
1. How long can make delivery?
For stock products, will make shipments in 5- 7 days after receiving deposit or receiving L/C; for products
need new production for common materials, usually make shipments in 15-20 days; for products need new production for special and rare materials, usually need 30-40 days to make shipment.
2. Will the Test Certificate be certified to EN10204 3.1?
For the new production products no need furthur cutting or processing, will provide the Original Mill Test Certificate certified to EN10204 3.1; for the stock products and the products need cutting or furthur processing, will issue Certificate of Quality on our Company, It will show the original mill name and the riginal datas.
3. Once the received products found not comply with the products the contract demands, what will you do?
Once the received products found not comply with the products the contract lists, when receiving the picturesand the official documents and data from your side, if it is proved not comply, we will compensate the loss at first time.