Steel & Products

High Carbon Steel Wire/Hot Dipped Steel Iron Wire

ZIBO XINWEI METAL PRODUCTS CO., LTD.
  • Alloy or Not:Non-alloy
  • Application:Rope, Manufacturing
  • Technique:Drawn Wire
  • Surface:Smooth
  • Certification:ISO
  • Standard:JIS, GB, ASTM, DIN

Base Info

  • Origin:China
  • Trademark:DINGXIANG
  • Specification:about 300KG
  • Steel Grade:Steel
  • Grade:Galvanized Wire
  • Model Number:Galvanized
  • Special Use:Free Cutting Steel
  • HS Code:7217100000
  • Production Capacity:4500 Ton,Month

Description

Product Name

High Carbon Mattress Bed Sofa Spring Steel WireStandard

DIN 17223-1, EN10270-1, JIS G 3206, JIS G 3521, JIS G 3522,

IS 4454, ASTM A 853-04, ASTM A 227, GOST 9389, GOST 14959

Usage

Mechanical Equipment,Engineering Vehicle,Motor Vehicle,

Motorcycle,Accumulator Car,Bicycle,Fitness Equipment,

Elevator,Steel Wire Screen,Mattress And Sofa,Umbrella Frame,Electronic Products,ect.

Spring Usage

Compression spring,torsion spring,extension spring,

agricultural machines,die springs,strip&wire forming springs

Product details
High Carbon Steel Wire/Hot Dipped Steel Iron Wire

Production process
High Carbon Steel Wire/Hot Dipped Steel Iron Wire
Certifications
High Carbon Steel Wire/Hot Dipped Steel Iron Wire
Company information

Our company offers variety of products which can meet your multifarious demands. We adhere to the management principles of quot&quality first, customer first and credit-based" Since the establishment of the company and always do our best to satisfy potential needs of our customers.
Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with an irresistible force.

PackingShipping
High Carbon Steel Wire/Hot Dipped Steel Iron Wire
FAQ

1 Q: Are you a producer or a trader?

   A:We are manufacturers with our own factories and can produce all kinds of products.

2 Q: Payment method?
   A: Advance payment 30% TT or according to customer requirements.

3 Q: Delivery time?
   A:10 working days after receiving the advance payment.

4 Q:Can not visit the factory?
 
 A:We welcome customers to visit our company and factory at any time.