Steel & Products

High Quality Promotion 40X40mm 6m Length Black Iron Square Tube Steel Pipe for Construction

Tianjin Royal International Trade Co., Ltd.
  • After-sales Service:Within 24 Hours
  • Type:Welded
  • Technique:Hot Rolled
  • Material:Carbon Steel
  • Surface Treatment:Black
  • Usage:Pipeline Transport, Boiler Pipe, Hydraulic,Automobile Pipe, Oil,Gas Drilling, Food,Beverage,Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose

Base Info

  • Model NO.:Royal-SHS
  • Section Shape:Square
  • Length:6m,12m or Customized
  • Surface:Mill Surface,Oil Painting,Black Oil ,Galvanized
  • Certificate:ISO,Mtc
  • Tolerance:±1%
  • Welding Line Type:ERW
  • Invoicing:by Actual Weight
  • Alloy or Not:Non-Alloy
  • Processing Service:Bending, Welding, Decoiling, Punching, Cutting, Mo
  • Delivery Time:7-15 Days
  • Payment:30%Tt+70%Tt , LC
  • Standard:ASTM,JIS,GB,AISI
  • Transport Package:Seaworthy Export Package
  • Specification:1′′*1′′~20′′*20′′
  • Trademark:Royal
  • Origin:Tianjin, China
  • HS Code:7306610000
  • Production Capacity:800000 Tons

Description

Overview

 

High Quality Promotion 40X40mm 6m Length Black Iron Square Tube Steel Pipe for ConstructionProduct Description

 

Company Profile

High Quality Promotion 40X40mm 6m Length Black Iron Square Tube Steel Pipe for ConstructionHigh Quality Promotion 40X40mm 6m Length Black Iron Square Tube Steel Pipe for ConstructionHigh Quality Promotion 40X40mm 6m Length Black Iron Square Tube Steel Pipe for ConstructionHigh Quality Promotion 40X40mm 6m Length Black Iron Square Tube Steel Pipe for ConstructionHigh Quality Promotion 40X40mm 6m Length Black Iron Square Tube Steel Pipe for Construction

High Quality Promotion 40X40mm 6m Length Black Iron Square Tube Steel Pipe for ConstructionFAQ

1.What's your MOQ?
A: 25 tons a container, mixed acceptable
2.What's your payment terms?
A: 30% in advance by T/T, 70% will be before shippment basic on FOB; 30% in advance by T/T, 70% against the copy of BL basic on CIF.
3. What's your delivery time?
A: 10-20 working days send to port after deposit arrival
4. How long time for your company has been in business?
A: We are a metal manufacturer of construction material for 20 years in steel industry.
5. Can we visit your factory to check production process and quality?
A: Yes, of course, welcome any time.
6.Do you have any mill certificates and meterial componential analysis reports?
A: Yes. we have professional quality analysis department.