Steel & Products

Q345b and N80q Steel Pipe for Piling and Drilling

Qingdao Xinguangzheng Huayang Construction Engineering Co., Ltd.
  • Type:Carbon Steel Bar
  • Standard:GB
  • Composition:Q345 N80
  • Technique:Hot Rolled
  • Shape:Bar
  • Surface Treatment:Polished

Base Info

  • Model NO.:XGZ
  • Application:Structural Steel Bar
  • Transport Package:with Blanket and PVC
  • Specification:114*8.56 146*8
  • Trademark:XGZ
  • Origin:Qingdao, China
  • HS Code:7304113000
  • Production Capacity:5000 Tons,Month

Description

Basic Info.

Model NO. XGZ Application Structural Steel Bar Transport Package with Blanket and PVC Specification 114*8.56 146*8 Trademark XGZ Origin Qingdao, China HS Code 7304113000 Production Capacity 5000 Tons/Month

Product Description


Q345b and N80q Steel Pipe for Piling and Drilling

Q345b and N80q Steel Pipe for Piling and Drilling
Q345b and N80q Steel Pipe for Piling and Drilling
specification:114*8.56  139*8.56  159*8.56   219*8.56
Material;Q345B  J55 N80-1 N80Q
we can manufacture as customer's need or according to customer'drawing 
All the design can be customized as required.
We have exported to UK,Korea and some island countries for many years and have had a good coorperation with our customers.
Light Steel Structure Equipment and Building Material

Q345b and N80q Steel Pipe for Piling and Drilling

Packing & Shipping Info

Packing:Seaworthy package that can be loaded in 20'GP/40'GP/40'HQ
Shipping: about 30-40 days after receiving the deposit.
Q345b and N80q Steel Pipe for Piling and Drilling

Q345b and N80q Steel Pipe for Piling and Drilling

 
Payment Terms
T/T 30% deposit after the order confirmed, and the 70% balance before shippment.
 

Our Advantage & Service
1)Rich experience and professional team
With more than 20 years' experience, our employees have been professionally trained and evaluated in light steel structure construction
2)Strictly quality control, Inspection every production link
There are 2-3 quality inspection personnel in each of our workshop to carry out the product inspection and reinspection
3)Preinstall before delivery
We test assembling after assembling the first batch products, and then batch assembly if they're qualified 4)Prompt Delivery.
Within 25-60 days after the order confirmed, also depends on the fabrication quantity.
 
We offer One stop service from design, manufacture, deliver to installation and after-service.



Q345b and N80q Steel Pipe for Piling and Drilling
Certification of our light steel structure constructions