Steel & Products

Factory Supply Dx51d DC01 G90 Cold Rolled Zinc Coated Galvanized Steel Coil Price 0.2mm 0.3mm Galvanized Steel Coil

Shandong gangpu metal materials Co., Ltd.
  • Technique:Cold Rolled
  • Surface Treatment:Galvanized
  • Certification:ISO, RoHS, IBR
  • Standard:ASTM, JIS, GB, AISI, DIN
  • Application:Container Plate
  • Edge:Mill

Base Info

  • Transport Package:Standard Sea-Packing
  • Length:as Your Requirement
  • Zinc Coating:40-600G,M2
  • Thickness:0.12-6.0mm
  • Width:20-1500mm
  • Tolerance:1%
  • Usage:Construction Structure
  • Quality:High Quality
  • MOQ:1 Ton
  • Price Term:Fob CIF CFR EXW
  • Payment Term:30%Tt+70% Balance
  • Stock:Stock
  • Model NO.:Dx51d DC01 G90
  • Specification:Q195-Q345
  • Trademark:GANGPU
  • Origin:China
  • Production Capacity:10000t,M

Description

Overview Product Description

Hot-dip galvanizing is the reaction of molten metal with an iron substrate to produce an alloy layer, thereby combining the substrate and the plating layer. Hot-dip galvanizing is to pickle iron and steel parts first. In order to remove iron oxide on the surface of iron and steel parts, after pickling, it is cleaned in an ammonium chloride or zinc chloride aqueous solution or a mixed solution of ammonium chloride and zinc chloride.And then sent to the hot-dip plating bath. Hot-dip galvanizing has the advantages of uniform coating, strong adhesion and long service life.

Product Image

 



Factory Supply Dx51d DC01 G90 Cold Rolled Zinc Coated Galvanized Steel Coil Price 0.2mm 0.3mm Galvanized Steel CoilFactory Supply Dx51d DC01 G90 Cold Rolled Zinc Coated Galvanized Steel Coil Price 0.2mm 0.3mm Galvanized Steel Coil

Packaging & Shipping

Factory Supply Dx51d DC01 G90 Cold Rolled Zinc Coated Galvanized Steel Coil Price 0.2mm 0.3mm Galvanized Steel Coil


 

Company Profile

FAQ

Q1. How long can make delivery?
A: For stock products,will make shipments in 5-10 days after receiving deposit or receiving T/T;
for products need new production for common materials,usually make shipments in 10-20 days;
for products need new products for special and rare materials,usually need 20-25 days to make shipment.

Q2. Can you provide the samples?
A:Samples can be provided with samples' charge and courier fee by the buyer's side.

Q3. What's your payment terms?
A: Down payments 30%TT and balance 70% TT or L/C.

Q4. Can you accept customize?
A: Yes. It can be customized as per the customers' request.

Q5. How to ensure the quality?
A:Mill Test Certificate is supplied with shipment.
If needed, a Third Party Inspection is acceptable or SGS