Steel & Products

Construction Carbon Steel Pipe Carbon Welded Spiral Steel Pipe for Oil Pipeline

Shandong Zhongheng Steel Group Co., Ltd.
  • After-sales Service:Negotiate According to Specific Products
  • Warranty:Negotiate According to Specific Products
  • Type:Seamless
  • Technique:Hot Rolled
  • Material:Carbon Steel
  • Surface Treatment:Black

Base Info

  • Model NO.:Q235,Q235B,Q345,Q345B
  • Usage:Pipeline Transport, Boiler Pipe, Hydraulic,Automobile Pipe, Oil,Gas Drilling, Food,Beverage,Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration
  • Section Shape:Round
  • Length:as Requested
  • Outer Diameter:as Requested
  • Thickness:as Requested
  • Application:Hardware Kitchenware, Shipbuilding, Petrochemical,
  • Technology:Hot Roll
  • MOQ:1 Ton
  • Wall Thickness:0.5mm-80mm
  • Sample:Provided
  • Ends:Plain or Beveled
  • Oil or Not:as Requested
  • Payment Term:Tt30%Deposil+70%Balance Before Shipment
  • Surface:Bared Black Painting, Anti-Corrosion Coating,Galva
  • Technical Methods:Hot-Rolled,Cold-Drawn,Hot-Expanded
  • Package:Seaworthy Standard Package
  • Delivery Time:Within 7-15 Days
  • Transport Package:Standard Export Seaworthy Package,or as Required.
  • Specification:As Your Requirement
  • Trademark:Zhong Heng
  • Origin:Shandong, China
  • HS Code:7219900000
  • Production Capacity:1000ton,Week

Description

Overview Product Description
 Product Parameters

Our Advantages

 

Construction Carbon Steel Pipe Carbon Welded Spiral Steel Pipe for Oil PipelineCertifications

Construction Carbon Steel Pipe Carbon Welded Spiral Steel Pipe for Oil Pipeline
 Company Profile
Packaging & Shipping

Construction Carbon Steel Pipe Carbon Welded Spiral Steel Pipe for Oil PipelineFAQ

 

Q: Why choose us?

A: Our company have been in steel business for more than ten years, we are internationally experienced, professional, and we can provide variety of steel products with high quality to our clients

Q: Can provide OEM/ODM service?
A:Yes. Please feel free to contact us for more details discuss.
 Q: How is your Payment Term? A:One is 30% deposit by TT before production and 70% balance against copy of B/L; the other is Irrevocable L/C 100% at sight.

Q: Can we visit your factory?

A:Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

Q: Can you provide sample?
A: Yes, for regular sizes sample is free but buyer need to pay freight cost.