Steel & Products

Gi/SGCC Dx51d Zinc Cold Rolled Coil/Hot Dipped Galvanized Steel Coil/Sheet/Plate/Strip

Shandong Tianhong Metal Products Co., Ltd.
  • Special Use:Cutting Tools, Measuring Tools, Cutters in Common Steel, High-strength Steel Plate, Wear Resistant Steel, Silicon Steel
  • Application:Mold & Dies, Ship Plate, Boiler Plate, Container Plate, Flange Plate
  • Surface Treatment:Galvanized
  • Technique:Cold Rolled
  • Standard:ASTM, AISI, GB, JIS, DIN, BS
  • Certification:ISO, RoHS, IBR

Base Info

  • Transport Package:Water Proof Paper Is Inner Packing, Galvanized Ste
  • Tolerance:1%
  • Color:Silver
  • Delivery Time:15-21 Days
  • Payment:30%Tt+70%Tt
  • Length:12m, 6m, 6.4m
  • MOQ:1 Ton
  • Brand Name:Th
  • Surface:Clean, Finishing, Blasting and Painting
  • Model NO.:GI,SGCC DX51D
  • Specification:1.5 - 80 mm
  • Trademark:TH
  • Origin:Shandong China
  • Production Capacity:60000ton,Year

Description

Overview Product DescriptionApplication

Gi/SGCC Dx51d Zinc Cold Rolled Coil/Hot Dipped Galvanized Steel Coil/Sheet/Plate/Strip

 

Packaging & Shipping

Gi/SGCC Dx51d Zinc Cold Rolled Coil/Hot Dipped Galvanized Steel Coil/Sheet/Plate/Strip

 

Company Profile

Gi/SGCC Dx51d Zinc Cold Rolled Coil/Hot Dipped Galvanized Steel Coil/Sheet/Plate/Strip

Gi/SGCC Dx51d Zinc Cold Rolled Coil/Hot Dipped Galvanized Steel Coil/Sheet/Plate/StripGi/SGCC Dx51d Zinc Cold Rolled Coil/Hot Dipped Galvanized Steel Coil/Sheet/Plate/Strip

Gi/SGCC Dx51d Zinc Cold Rolled Coil/Hot Dipped Galvanized Steel Coil/Sheet/Plate/Strip

 

Gi/SGCC Dx51d Zinc Cold Rolled Coil/Hot Dipped Galvanized Steel Coil/Sheet/Plate/Strip

 

 

FAQ

Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;
for products need new production for common materials,usually make shipments in 7-10 days;
for products need new products for special and rare materials,usually need 15-20 days to make shipment.

Q2. Can you provide the samples?
A:Samples can be provided with samples' charge and courier fee by the buyer's side.

Q3. What's your payment terms?
A: Down payments 30%TT and balance 70% TT or L/C.

Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive.
Airline and sea shipping also optional.
For mass products, ship freight is prefered.

Q5. Can you accept customized?
A: Yes. It can be customized as per the customers' request.