Steel & Products

Hot Dipped Gal Nps Thread EMT Galvanised Pipe

Tianjin Youfa International Trade Co., Ltd.
  • Surface Treatment:Galvanized
  • Usage:Pipeline Transport, Machinery Industry, Construction & Decoration
  • Material:Carbon Steel
  • Technique:ERW
  • Section Shape:Round
  • Key Words:EMT Pipe

Base Info

  • Specification:BS EN 10255
  • Transport Package:Hexagonal Shaped Seaworthy Bundle
  • Galv Steel Tube Advantage 4:We Have 15 Years Export Experience
  • Galv Steel Tube Advantage 3:We Export to 60 Countries in 2014
  • Galv Steel Tube Advantage 2:We Produce 9 Million Tons in 2014
  • Galv Steel Tube Advantage 1:Youfa Has 160 Production Lines
  • Trademark:YOUFA
  • Origin:Tianjin, China
  • HS Code:73063090
  • Production Capacity:9 Million Tons Per Year

Description

Outer DiameterRound pipe: 20~610mmWall ThicknessRound pipe: 0.8~18.0mmLength3-12M according to client requirementStandardEN10255, EN10219, EN10210, EN39, BS1387, ASTM A53, ASTM A500, ASTM A36, API 5L, ISO 65, JIS G3444, JIS3452, DIN 3444, ANSI C80.1, AS 1074, GB/T 3091MaterialGr.A, Gr.B, Gr.C, 
S235, S275, S355, 
A36, SS400, 
Q195, Q235, Q345CertificateISO 9001:2008,SGS, BV, CCIC etcFinish of pipeHot dipped galvanized with zinc 220~260g/m2;
Pre-Galvanized with zinc 30~150g/m2
Painted with black/varnish lacquer;
Oil on the surface to prevent rust;
Bare pipe without painting:
Epoxy painting/FBE coating/3PE coatingPipe EndPlain end/ Bevel end;
Groove end;
Joint with flange;
Threaded on two ends, one end with coupling, one end with plastic capMarkingAs per client requirement or mill standard
Painting method: Spray white paintPackingOD not less than 273mm: Loose packing,piece by piece.
OD less than 273mm: In hexagonal seaworthy bundles packed by steel strips.
small sizes nested into big sizes.ApplicationsConstruction / building materials steel pipe
Steel structure
Scaffolding pipe
Fence post steel pipe
Fire protection steel pipe
Greenhouse steel pipe
Low pressure liquid, water, gas, oil, line pipe
Irrigation pipe
Handrail pipeTechinicalERW (high - frequency welded)Trade TermFOB, CFR, CIF, EXW, FCAPayment TermT/T, LCDelivery Time15-45 days (based on quantity) after receiving advanced payment by T/T or LC .Main MarketSoutheast Asia, South Asia, Middle East, Europe, 
Middle&South America, Africa and Oceania
Detailed size:

 
3 Usage
(1) Sacffolding, Pipe prop
(2) Fluid Convey,
(3) Fence,
(4) Structure,
(5) EMT,
(6) Water pipe