
Double Wall Copper Coated Steel Tube for Refrigerator, Freezer Evaporator, Condenser
Qingdao Maxcool International Trading Co., Ltd.- Type:Welded
- Technique:Cold Rolled
- Material:Alloy Steel
- Surface Treatment:Copper Coated
- Usage:Pipeline Transport, Boiler Pipe, Hydraulic,Automobile Pipe, Oil,Gas Drilling, Food,Beverage,Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
- Section Shape:Round
Base Info
- Model NO.:bundytube
- Transport Package:Seawirthy
- Specification:Customized
- Trademark:MAXCOOL
- Origin:China
- Production Capacity:5000000tons
Description
Basic Info.
Model NO. bundytube Transport Package Seawirthy Specification Customized Trademark MAXCOOL Origin China Production Capacity 5000000tonsProduct Description
Product Descriptioncopper coated cooling steel bundy tube for refrigerator parts
copper coated cooling steel bundy tube for refrigerator partsStandard: ASTM,DIN,UNI,GB
Copper,Zinc plated
hot sale
CE
Specification:
Copper coated cooling steel bundy tube for refrigerator parts
Copper coated bundy tubes
φ4.76mm× 0.7±0.01mm1
φ6.00mm× 0.7±0.01mm
φ6.35mm× 0.7±0.01mm
φ8.00mm× 0.7±0.01mm
φ9.52mm× 0.7±0.01mm
φ10.00mm × 0.7±0.01mm
φ12mm× 0.7±0.01mm
3/16', 1/4',5/16', 3/8'
1.4.76mm,6mm,6.35mm,8mm copper coated bundy tube,condenser tube,copper coated steel tube
2.different models avalable
3.76mm,6mm,6.35mm,8mm copper coated bundy tube bundy tube,condenser tub.bundy pipe,copper coated steel tube, copper coated bundy tube
4,Main use:weldly used in evaporators,refrigerators,automobils and heaters.
5.Features:high intensity,good palasticity,and smal resistance.
6.Standards:ASTMA254-9
7.materials can be altered according to customers requirements.
8. Mechanical functions:
Rm≥290Mpa
Rel≥180Mpa
A≥25%
9. ID cleanliness: residuum≤0.16g/ m²
10. Neuter hydrochloric acid trial: no rusty on OD in 120hours
11. Packing: export standed, box, palstic,etc (according to customers requirements)
According to customer's requirements.
Packaging & Shipping
Packaging Details:pallet
Port china
Lead Time : 15-20days

