Steel & Products

Carbon Steel Dsaw Steel Pipe

Zhejiang Hang Heavy Technology Co., Ltd.
  • Type:Welded
  • Technique:Cold Drawn , Cold Rolled
  • Material:Bs1387 Q195 Q235 Q345 En10219 GB,T6725 ASTM A53
  • Surface Treatment:Bared, Oiled, Color Paint, 3lpe, or Other
  • Usage:Special Purpose, Construction & Decoration, Furniture Pipes
  • Section Shape:Round, Square, Rectangular

Base Info

  • Item:Factory Supply Welded Carbon Steel Pipe Furniture
  • Length:5.8~12m or Upon Customer′ Requirements
  • Model Number:Pipe Furniture (Wufu150106)
  • Secondary or Not:Non-Secondary
  • Transport Package:Bared, Oiled, Color Paint, 3lpe, or Other
  • Specification:CE, ISO, SGS AND SO ON
  • Trademark:WUFU Pipe Furniture
  • Origin:Hangzhou, China Mainland
  • Production Capacity:250, 000 Ton,Year

Description

Products DetailsCommodityWholesale factory supply welded carbon steel pipe furnitureOuter diameter    ERW / HFWLSAW / DSAWSSAW / HSAWRHSSHS1/8 - 20 inch
(10.3 - 508 mm)12 - 56 inch
(323.8 - 1,420 mm) 8 - 126 inch
(219.1 - 3,200 mm)40 x 20 mm -
1,000 x 800 mm15 x 15 mm -
 1,000 × 1,000 mmWall thickness0.4 - 16 mm6.0 - 40 mm6.0 - 26 mm1.0 - 30 mm0.6 - 30 mmLength5.8 ~ 12.0 m or upon customers' requirementsStandardGB/T 3091, GB/T 13793, ASTM A252, ASTM A53, ASTM A500, EN 10210, EN 10219, API 5L,
DIN 1626/1615, DIN 17120, etc.GradeSS400, Q235, Q345, Q460, A572 Gr.50, Gr.1/Gr.2/Gr.3, S235, S275, S355, Grade A/B, X42, X52,
X60, X70, etc.SurfacePrime quality (bared, oiled, color paint, 3LPE, or other anti-corrosive treatment)InspectionWith Chemical Composition and Mechanical Properties Analysis;
Dimensional and Visual Inspection, also with Nondestructive Inspection.Applicationstructure, electric power transmission tower projects, piling, water, oil & gas pipeline engineering, mechanical industry, municipal projects, roads and its auxiliary facilities, etc.PackingStandard export, in bulk / bundles / nylon fabric bags with seaworthy packing;
or according to customers' requestments.Delivery Time1. 20-45 days after received deposit or confirmed L/C
2. Depends on your oder quantityPayment Terms1. T/T: 30% T/T advance, 70% balance copy of  B/L
2. L/C: at sight
3. T/T and L/C: 30% T/T advance, 70% L/C PortChina main port