Steel & Products

Alloy Steel Round Bar of Mould Steel 1.2344 H13 SKD61

Guangzhou Changfeng Steel Co., Ltd.
  • Type:Alloy Steel Bar
  • Standard:AISI, ASTM, GB, JIS, DIN, BS
  • Technique:Hot Rolled
  • Application:Tool Steel Bar, Die Steel Bar
  • Surface Treatment:Black, Grinded, Machined
  • Alloy:Alloy

Base Info

  • Model NO.:1.2344,H13,SKD61,4Cr5MoSiV1
  • Special Use:Mold Steel, Used for Making Hot Work Mould
  • Production Route:Ef,Eaf+Lf+Vd,ESR
  • Quality Inspection:Ut, Chemical Composition
  • Process Technique:Forged or Hot Rolled
  • Payment:30% Deposit, Blance by L,C at Sight or T,T
  • Delievry Quantity:Include MOQ
  • Heat treatment:Annealing or Q+T
  • Transport Package:Export Standard Packing or Customers′demand
  • Specification:diameter 16-200mm
  • Trademark:CF STEEL
  • Origin:China
  • HS Code:7228300000
  • Production Capacity:1000t,Month

Description

Equivalent gradesBrief  IntroductionGBDINAISIJISASSAB1.2344 is the pressure resistant hot work die steel. The electroslag remelting of the steel is of uniform material, good hardenability, excellent mechanical and polishing properties, high toughness and plasticity, good high and low temperature wear resistance, and high temperature fatigue and heat resistance.4Cr5MoSiV11.2344H13SKD618407Available size(mm)Flat Bar Size(mm)Round bar Size(mm)ThicknessWidthLengthDiameterLength16-260205-6102000-600016-2003000-6000Chemical Composition(%)CSiMnPSCrMoV0.32-0.450.80-1.200.20-0.50≤0.030≤0.0304.75-5.501.10-1.750.80-1.20Recommend heat treatmentquenchingtemperingHeating temperature/ºCCooling wayHardness (HRC)Tempering temperature
/ºCTempering numberHardness
(HRC)First preheatingSecond preheatingLast heating500-550750-8001020-1050Oil Cooling or Air Cooling56-58560-580340-45Feature1) Electroslag remelting steel, the steel has a high hardenability and thermal cracking resistance, the steel contains a higher content of carbon and vanadium, good wear resistance, toughness is relatively weakened, with good heat resistance.
2) High temperature with good strength and hardness, high wear resistance and toughness, excellent comprehensive mechanical properties and high resistance to tempering stability.Applications1,,Used to make forging die, hot extrusion die, precision forging die, die for aluminium, copper and its alloy mould.
2,Applicable to hot work, aluminum, magnesium, zinc, copper alloy die-casting die, cutting groove knife, scissors and hot forging action, plastic mold, hot work reamer, rolling knife, general hot forging die, hot bolt mold, heat, all kinds of tools, etc.Technical serviceDie vacuum heat treatment and die surface treatment(N-O,C-N,carburize and nitridation surface treatment).Terms of payment:30% deposit T/T and the balance by L/C at sight, or T/TDelivery condition:For abundant stock, 15-20 days.For customized products, 30-50 days.    

Product Photo

Alloy Steel Round Bar of Mould Steel 1.2344  H13 SKD61
Alloy Steel Round Bar of Mould Steel 1.2344  H13 SKD61


Strict Quality Control

Alloy Steel Round Bar of Mould Steel 1.2344  H13 SKD61

Loading Photo

Alloy Steel Round Bar of Mould Steel 1.2344  H13 SKD61

FAQ:

Q: Are you a manufacturer or merely a trader?
A: We are trading company act as exporting Steel Products with our own factory,
we can manufacture the products as in cutomer's requirement,wholesale and retail all kinds of domestic mould steel,the price we offered is very competitive compared with other agents.

Q: How do you guarantee the quality of your product?
A: Firstly, we can provide the certificates from the third party, such as SGS, CE,ISO if you need. Secondly, we have a complete set of inspection system and every process is checked by QC. Quality is the lifeline of enterprise survival. Third,the products we export are mainly from ShaGang group, WenFeng group, XingCheng group, DongTe group,DaYe and so on, the quality are certained.
 
Q: Delivery time?
A: We have ready stock for most of material grades in our warehouse. If the material don't have stock, the delivery lead time is about 30-50 days after receiving your prepayment or firm order.
 
Q: What is the payment term?

A:100% T/T  or 30%T/T deposite prepaid, 70%Balance L/C.
 
Q: Can we visit your company and factory?

A: Yes, warmly welcome! We can book the hotel for you before you come to China and arrange our driver to our airport to pick you up when you come.