Steel & Products

Carbon ERW Steel Pipe Hollow Section Galvanized/Welded/Black/Seamless/Stainless Round Tube/Pipe for Scaffolding

Shandong Jichang Import and Export Co., Ltd.
  • After-sales Service:Answer All The Questions
  • Type:Seamless
  • Technique:ERW
  • Material:Stainless Steel
  • Surface Treatment:Galvanized
  • Usage:Pipeline Transport, Boiler Pipe, Hydraulic,Automobile Pipe, Oil,Gas Drilling, Food,Beverage,Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose

Base Info

  • Section Shape:Round
  • Tolerance:1%
  • Size:21-609.6mm
  • Length:1-12m
  • Processing Service:Bending, Welding, Decoiling, Punching, Cutting
  • Application:Fluid Pipe
  • Secondary or Not:Non-Secondary
  • Alloy or Not:Non-Alloy
  • Grade:10#-45#, 16mn, A53-A369, API J55-API P110, Mo, Q19
  • Transport Package:in Bulk, in Bunddle, in Water Proof Plastic Wrrap
  • Specification:Type: Welded Steel Pipe
  • Trademark:Shandong Jichang
  • Origin:Shandong
  • Production Capacity:80000t,Years

Description

ItemsDimentionGradeManufactured TechRound DN15*1.2--DN300*8.0Q235, Q345ERW, GalvanizedSquare20*20*1.4--300*500*15.75Q235, Q345ERW, GalvanizedRectangle20*20*1.4--300*500*15.75Q235, Q345ERW, GalvanizedProduct ShowCarbon ERW Steel Pipe Hollow Section Galvanized/Welded/Black/Seamless/Stainless Round Tube/Pipe for ScaffoldingCarbon ERW Steel Pipe Hollow Section Galvanized/Welded/Black/Seamless/Stainless Round Tube/Pipe for Scaffolding Carbon ERW Steel Pipe Hollow Section Galvanized/Welded/Black/Seamless/Stainless Round Tube/Pipe for ScaffoldingCarbon ERW Steel Pipe Hollow Section Galvanized/Welded/Black/Seamless/Stainless Round Tube/Pipe for Scaffolding
Carbon ERW Steel Pipe Hollow Section Galvanized/Welded/Black/Seamless/Stainless Round Tube/Pipe for ScaffoldingCarbon ERW Steel Pipe Hollow Section Galvanized/Welded/Black/Seamless/Stainless Round Tube/Pipe for ScaffoldingCarbon ERW Steel Pipe Hollow Section Galvanized/Welded/Black/Seamless/Stainless Round Tube/Pipe for ScaffoldingFAQ
Q1: Shipping&price term? A: Both FOB/CIF/CFR price term are ok, we have reliable forwarder helping arrange the shipment for you
Q2: How do I pay? A: TT and LC are acceptable and TT will be more appreciated. 30% paid for deposit by T/T before production. 70% balance to bepaid by T before shipment.
Q3: What is your terms of payment ? A: Pavment<=1000USD, 100% in advance, Pavment=1000USD. 30% T/T in advance balance before shippment.
Q4: How do you pack the products? A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid bvcustomers.
Q5: How long is your delivery time? A: Generaly it is 5-10 days if the gods are in stock. or it is 20-50odays if the goods are not in stock, it is accordina to quantity