Steel & Products

Uni Fe510c I Beam Worldwide Equivalents of Grade Fe510c (Inter: ISO) Fe510c Section Steel Iron Angle Steel

Wuxi Hengchengtai Special Steel Co., Ltd.
  • Type:Seamless
  • Technique:Hot Rolled
  • Material:Carbon Steel
  • Surface Treatment:Black
  • Usage:Pipeline Transport, Boiler Pipe, Hydraulic,Automobile Pipe, Oil,Gas Drilling, Food,Beverage,Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
  • Section Shape:Special Section

Base Info

  • Model NO.:UNI Fe510C
  • MOQ:1ton
  • Length:6-12mm as Customized
  • Tolerance:0.1mm
  • Processing Wervice:Bending Cutting Beveling Groove Punching
  • Testing:Accept Third Party Inspection
  • Yield Strength:500MPa
  • Tensile Strength:400MPa
  • Delivery Status:Hot Rolled Cold Drawn
  • Delivery Time:10-15days After Receiveing The Payment
  • Standard:ASTM GB JIS DIN
  • Trading Term:CIF CFR Fob
  • Payment:Tt LC Western Union
  • Other:Accept Factory Inspection
  • Transport Package:Waterproof Package
  • Specification:10#
  • Trademark:wuxihengchengtai
  • Origin:Wuxi, China (Mainland)
  • HS Code:2200
  • Production Capacity:520000pieces

Description

Payment1.30%T/T in advance,balance paid before shipment.2.Quantity large,100% L/C At Sight can be consideredDelivery time7-30 days after receving prepayment and according to order quantityApplicationsteel structures,building&bridge construction,engineering machinery etc.Uni Fe510c I Beam Worldwide Equivalents of Grade Fe510c (Inter: ISO) Fe510c Section Steel Iron Angle Steel
Uni Fe510c I Beam Worldwide Equivalents of Grade Fe510c (Inter: ISO) Fe510c Section Steel Iron Angle Steel

Uni Fe510c I Beam Worldwide Equivalents of Grade Fe510c (Inter: ISO) Fe510c Section Steel Iron Angle Steel
1, what is your time of sending a sample

we will take 1~3 days to sending the sample

2,What is your delivery time?

For stocks, we can send the goods to loading port within 7 days after receiving your deposit

For production period, it usually needs about 15days- 30 days after receiving the deposit

3, What is your shipping port?

Shanghai port

4, What is your payment terms?

Usually 30% deposit by TT in advance and balance against copy of BL or LC at sight