Steel & Products

15crmog, 12cr1movg Drain Superheat Boiler Tube

Guangzhou Kingmetal Steel Industry Co., Ltd.
  • Type:Seamless
  • Technique:Hot Rolled
  • Material:15crmog, 12cr1movg
  • Surface Treatment:Black
  • Usage:Boiler Pipe, Chemical Industry, Construction & Decoration, Special Purpose
  • Section Shape:Round

Base Info

  • Model NO.:KM-81
  • Wt:2.5~80mm
  • Od:10~540mm
  • Certification:ISO,CE
  • Package:in Bundles or as Required
  • Price Term:Fob,CIF,CNF
  • Brand:Km
  • Secondary or Not:Not Secondary
  • Delivery Time:15-30days After Down Payment
  • Alloy or Not:Alloy
  • Payment:T,T L,C
  • Transport Package:Bundles
  • Specification:1,4′′-48′′
  • Trademark:KINGMETAL
  • Origin:China (Mainland)
  • Production Capacity:20000ton,Month

Description

commoditySeamless Steel BoilerTubeStandardASTM/DIN/EN/JIS/GB/GOSTmaterialAlloy steelOD1/2"-48",10mm-1219mmWTSCH5,SCH10,SCH20,SCH40,SCH60,SCH80,SCH100,SCH120,SCH160,XXSUsageAlloy steel pipe applies to petroleum, chemical industry, electric power, boiler, high temperature resistant, low temperature resistant, corrosion resistant steamless steel pipe used.Other testHY,ET according to requestLength2-12m as your requiredSurfaceBlack paint as rusty protect, capped endsMarksAs per customers' requirement (Hard marking or spray marking)PackingStandard export sea-worthy package, or as customers' requestShipmentIn bundles, shipped in 20 or 40 feet containers, break bulk vessel acc to QTY and discharge portEndsPE,BEMethod140mm below cold drawn,140mm above hot rolled,273mm above hot expand 
Thickness:2.5 - 80 mmSection Shape:RoundOuter Diameter:10 - 540 mm
Place of Origin:China (Mainland)Secondary Or Not:Non-secondaryApplication:Boiler Pipe
Technique:Hot RolledCertification:ISOSurface Treatment:As your requirement
Alloy Or Not:Is AlloyMaterial:12cr1movg 42CrMo,42CrMo4,15CrMoGrade:12Cr1MoVG,Cr-Mo alloy
Standard:JIS G3458-2005,JIS G3467-2006,GB 5310-1995,GB 9948-2006,GB 6479-2000,DIN 17175,ASTM A213-2001,ASTM A335-2006,JIS,GB,DIN,ASTM

Packaging & Delivery

Packaging Detail:in bundles or according to the customer's requirements
Delivery Detail:15-20 DAYS

15crmog, 12cr1movg Drain Superheat Boiler Tube

15crmog, 12cr1movg Drain Superheat Boiler Tube