
DIN2391st37 Cold Drawn Carbon Seamless Steel Pipe for Hydraulic Pressure Pipe
Qingdao Ironsteel International Trading Co., Ltd.- Type:Seamless
- Technique:Cold Rolled, Cold Drawn, Honed
- Material:Carbon Steel
- Surface Treatment:Bare Pipe
- Usage:Machinery Industry, Chemical Industry, Special Purpose
- Section Shape:Round
Base Info
- Model NO.:IR-B steel pipe
- Size:30mm~416mm
- Length:Fixed Length, by Random
- End Processing:Plain Ends
- Surface:Bare Pipe, Anti-Rust Painting
- Transport Package:Standard Seaworthy Packing
- Specification:ASTM A210
- Trademark:Iron&steel
- Origin:China
- HS Code:73045910
- Production Capacity:2000tons Per Month
Description
Basic Info.
Model NO. IR-B steel pipe Size 30mm~416mm Length Fixed Length, by Random End Processing Plain Ends Surface Bare Pipe, Anti-Rust Painting Transport Package Standard Seaworthy Packing Specification ASTM A210 Trademark Iron&steel Origin China HS Code 73045910 Production Capacity 2000tons Per MonthProduct Description
DIN Standard Carbon Seamless Steel Pipe for Hydraulic PipeDINl7175 Deutsches industrial standard~
Outer diameter from 1/4'' to 48''
Steel grade: ST52, ST42, 20#, 45#,




Production | hydraulic pipe |
Specification | 13.7mm-1219.2mm (1/4''-48'')× 1.5mm-60mm |
Standard | GB, AS API 5L x42 ,PSL 1 carbon steel SLAW pipe TM, API 5L, API 5CT,DIN, JIS and so on |
Out Diameter | 13.7mm-1219.2mm (1/4''-48'') |
Wall Thickness | 1.5mm-60mm |
Grade | 10#,20#,45#,16Mn,Q235,304L ,316L,ST42,ST52,A106-a,A106-b,27SiMn,12Cr1MoV, and so on |
Length | 5-12m. As customers requirements. |
Origin | shandong, China |
Model Number | 13.7mm-1219.2mm (1/4''-48'')× 1.5mm-60mm |
Technique | Seamless, welded |
Usage | 1. Low and middle pressure fluid transportation pipeline 2. Casing Tube 3. Boiler Pipe 4. Petroleunm and natural gas industry 5. Chemistry industry 6. Electric industry |
Package | 1. Bevelled end or plain end or warnished as per buyer's requirements. 2. Marking: as per customer's requests. 3. Painting varnish coating on the pipe. 4. Plastic caps ends. |
Delivery Time | 15-30 days or as clients requirements. |
Supply | 1. seamless steel pipe 2. ERW steel pipe 3. steel casing 4. tubing 5. hot-rolled steel pipe 6. spiral steel pipe 7. hot-galvanized steel pipe |