-
Stainless Steel Strip 3mm 200series 300series 400series Steel Strip Manufacturers
PaymentPayment by T/T,30% as advance payment and70% balance pay before shipping.Delivery timeA.7 days if this goods is stock goods.B.20 days if this goods will be produced after orderValidityValid time is 3 days for price usually.
-
Hot Rolled Building Material ABS/ASTM/API/En10025/Rina/GB Bridge/Ship Steel Plate
-
Stainless Steel Strip 1mm Thick with 2b Ba Finished
PaymentPayment by T/T,30% as advance payment and70% balance pay before shipping.Delivery timeA.7 days if this goods is stock goods.B.20 days if this goods will be produced after orderValidityValid time is 3 days for price usually.
-
API 5st Ts70/Ts80/Ts90/Ts100 Oil Oiled Tubing
Size of Coiled TubingO.D.inch1"1.25"1.5"1.75"2"2.375"2.625″2.875"3.25"3.5"W.T.inchmm25.431.7538.144.4550.860.32566.67573.02582.5588.90.075"1.905√√0.080"2.032√√0.083"2.108√√0.087"2.21√&rad
-
CCS/ABS/BV High-Strength Carbon Ship/Bridge Prime Hot Rolled Steel Plate
-
G3322 Cglcc ASTM A755 CS-B Prepainted Galvanized Steel Coil
Front: double coated&double drying. Back: double coated&double drying, single-coated&double dryingType of substratehot dipped galvanzied, galvalume, zinc alloy, cold rolled steel, aluminumThickness0.16-1.2mmWidth600-1250mmCoil Weight3-9TonsInside Diameter508mm Or 610mmZinc CoatingZ30-Z27
-
Ss Industry for Water Project Stainless Steel Seamless Pipe
7-15 days,or according to the order quantity or upon negotiationGANGPU's stainless steel pipe features both seamless and welded pipe that is cold finished, annealed and pickled in a range of diameters and stock lengths. Offered in both 304/304L and 316/316L alloys, our stainless steel pipe blends co
-
Hot Rolled Structure System Support Materials Falt Steel Bar