
Steam Insulation Pipe with Carbon Steel Pipe and Rock Wool
CANGZHOU KAIWEI PIPELINE CO., LTD.- Type:Welded
- Technique:SAW
- Material:Carbon Steel
- Surface Treatment:Black
- Usage:Pipeline Transport, Boiler Pipe, Hydraulic,Automobile Pipe, Oil,Gas Drilling, Food,Beverage,Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
- Section Shape:Round
Base Info
- Model NO.:12-910mm
- Temperature Classification:High Temperature Piping
- MPa Classfication:High Pressure Piping
- Standard:ASTM, GB, API, DIN, JIS
- Cross-Section Shape:Round
- Diameter:18mm-3020mm
- Medium:Lquid or Gas
- Connection Type:Welding or Seamless
- Transport Package:Container
- Specification:18mm-3020mm
- Trademark:KAIWEI
- Origin:China
- Production Capacity:300000ton,Year
Description
O.D. 18mm-3020mmW.T. 6mm-40mm Length: 6m-12m Offer price: USD 700-1300 FOB Working temperature: according to customer requirement Working pressure: according to customer requirement Manufacture Capacity: 800,000.0 tons annually Delivery terms: FOB or CIF Payment terms: T/T or L/C Mini order: 10 tons



FAQ
Q1:How about thequality?
A:Third party inspections are always welcomed. Like BV, SGS etc.
Q2: How long is the delivery time?
A: Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And also
according to the quantity.
Q3:Do you provide samples? Free or not?
A: Yes, we could offer the sample for free but do not pay the cost of freight.
Q4:May I customize the steel pipe?
A:Sure you can, we can produce according to your requirement, you can send the CAD or
design drawing.
Q5:Any value-added Services?
A:Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessities
to perform in-house painting,coating,pipe cutting, etc.
Q6: How about the trade terms?
A: EXW, FOB, CFR, CIF, LC will be accepted.



FAQ
Q1:How about thequality?
A:Third party inspections are always welcomed. Like BV, SGS etc.
Q2: How long is the delivery time?
A: Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And also
according to the quantity.
Q3:Do you provide samples? Free or not?
A: Yes, we could offer the sample for free but do not pay the cost of freight.
Q4:May I customize the steel pipe?
A:Sure you can, we can produce according to your requirement, you can send the CAD or
design drawing.
Q5:Any value-added Services?
A:Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessities
to perform in-house painting,coating,pipe cutting, etc.
Q6: How about the trade terms?
A: EXW, FOB, CFR, CIF, LC will be accepted.