
API 5L Gr. B Seamless Steel Pipe Oil Gas Pipe
Tianjin Tianyingtai Steel Pipe Co., Ltd.- Type:Seamless
- Technique:Cold Drawn
- Material:Carbon Steel
- Surface Treatment:Copper Coated
- Usage:Pipeline Transport, Oil,Gas Drilling
- Section Shape:Round
Base Info
- Model NO.:LK200420
- Standard:API, ASME, ANSI
- Grade:as Request
- Length:3-15m
- Length Tolerance:0-20mm
- Thickness:1.24-50mm
- Thickness Tolerance:+,-12.5%
- Surface:as Request
- MOQ:1 Ton Per Size
- Certificate:API, ISO
- OEM Service:Available
- Delivery Time:25-40 Days
- Payment Term:Tt or LC
- Packing:in Bundles
- Ends:Threading, Bevelled or as Request
- Using Life:More Than 10 Years
- Transport Package:in Bundle or as Customers′ Request
- Specification:10.3-1219.2mm
- Trademark:TYT(tianyingtai)
- Origin:Tianjin, China
- HS Code:7304319000
- Production Capacity:500000 Ton , Year
Description
All your requirement will be met with the best prices, high quality, shortest delivery.Item Seamless SSAW ERW LSAW Outer diameter Cold drawn: 21-114mm Hot rolled: 114-406mm Expanded: 406*914mm 219-3120mm 6.0-610mm 406-1620mm Wall thickness Cold drawn: 1.7-22.5mm
Hot rolled: 10-50mm 3.0-2.5mm Max 26.5mm Max 65mm Standard API 5L, ASTM A106, ASTM A53. ASME, ANSI API 5L, EN10217, DIN2458, BS1387 API 5L, BS 1387,
JIS - G344, CB/T 3091-2001 API 5L, EN10217, DIN2458, BS 1387
2. Detailed Images




3. Our company


4. Laboratory
For doing some test and to give the cliends a dippe impression on us TYT.

5. Certificates

6. Our other related products
We not only produce steel pipe for more than 10 years, but also we have a scaffolding factory too.

7. Packing and delivery details
Packing details: In bundle by steel strip or other way and as clients requests.
Delivery details: After reveicing the LC or TT - deposit, usually we will load in 30 days.

Hot rolled: 10-50mm
JIS - G344, CB/T 3091-2001
2. Detailed Images




3. Our company


4. Laboratory
For doing some test and to give the cliends a dippe impression on us TYT.

5. Certificates

6. Our other related products
We not only produce steel pipe for more than 10 years, but also we have a scaffolding factory too.

7. Packing and delivery details
Packing details: In bundle by steel strip or other way and as clients requests.
Delivery details: After reveicing the LC or TT - deposit, usually we will load in 30 days.
