
Factory Price Galvanised Cutted Steel Wire Binding Wire
ZIBO XINWEI METAL PRODUCTS CO., LTD.- Certification:ISO
- Surface:Smooth
- Technique:Drawn Wire
- Application:Manufacturing
- Alloy or Not:Non-alloy
- Standard:JIS, GB, ASTM, DIN
Base Info
- Type:Black
- Special Use:Cold Heading Steel
- Model Number:Steel Wire
- Wire Gauge:0.15mm-6.0mm
- Specification:about 300KG
- Trademark:DINGXIANG
- Origin:China
- HS Code:7217100000
- Production Capacity:4500 Ton,Month
Description
ASTMA421, AS/NZS4672, ABNT NBR7482, BS58116-11180, EN10138-2,
GB/T5223, JIS G3536, KSD 7002
cement electricity poles, railway sleeper, subway track board, concrete piles,
beams, girders, slabs, hollow floor board, double-T board, PHC

Production process

Our Services
1.We are a professional MANUFACTURE of Prestressed Concrete steel wire(PC wire)in China.
2.Now our company have 8 advanced production lines and a whole set of product detecting instruments.
3.We have exported less than 50,000 tons abroad and this year we will make a better achievement.
4.We provide the best payment condition and Short Delivery time.
Certifications
Company information
Our company offers variety of products which can meet your multifarious demands. We adhere to the management principles of quot&quality first, customer first and credit-based" Since the establishment of the company and always do our best to satisfy potential needs of our customers.
Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with an irresistible force.
Factory workshop
Packaging & Delivery
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.